您现在的位置:首页 > 乐清市东禾电气有限公司 > HXGN17-12 Box type fixed AC metal enclosed switchgear

HXGN17-12 Box type fixed AC metal enclosed switchgear

价格面议
品牌
产品型号
数量
获取底价 查看电话 收藏商品
联系人信息
联系人 陈积来 手机 18367863666 电话 0557-57151737
公司全称 乐清市东禾电气有限公司
让卖家联系我
*联系信息:
咨询问题:
*图形验证:
发送询价单
询价产品: HXGN17-12 Box type fixed AC metal enclosed switchgear
*采购数量:
*联系信息:
公司名称:
采购说明:
产品信息
联系方式

Summary

HXGN17-12 type fixed AC metal enclosed switchgear (referred to as ring network cabinet) has a rated voltage of 12kV. The complete set of AC high-voltage electrical equipment with rated frequency of 50Hz is mainly used for three-phase AC ring network, terminal distribution network and industrial electrical equipment. It plays the role of receiving and distributing electric energy and. It is also suitable for box type substation.

Model meaning

型号含义

Service environmental conditions

◆ ambient air temperature: - 15 ℃ ~ + 40 ℃;

◆ altitude: 1000m and below;

◆ humidity conditions: the daily average value shall not be greater than 95%, and the daily average value of water vapor pressure shall not exceed 2.2kpa;

◆ the monthly average value shall not be greater than 90%, and the monthly average value of water vapor pressure shall not exceed 1.8kpa.

◆ seismic intensity: no more than 8 degrees;

◆ places without obvious pollution such as corrosive or combustible gases. Note: if the above normal use conditions are exceeded, the user can negotiate with the company.

Main technical parameters of vacuum circuit breaker

真空断路器主要技术参数

安装尺寸

Installation, storage, transportation, acceptance, use and troubleshooting

◆ packaging, storage and transportation

◇ the ring main cabinet is packed in a single wooden box when leaving the factory. Tipping, inversion and violent vibration are not allowed during storage and transportation. When moving, it is not allowed to push and pull directly on the ground; When there is no lifting device, the cylinder can be padded under the sleeper of the packing box to make it slide to the installation position.

◇ prevent the cabinet from rain and moisture.

◇ the ring main unit shall be placed in a place with good ventilation and can prevent the invasion of various harmful gases. It is strictly prohibited to store in the same warehouse with chemicals, acid and alkali, etc. ◆ acceptance

◇ check whether the package is damaged before unpacking, and pay attention to protect the product when unpacking.

2.2 inspect the appearance of the cabinet; At the same time, check whether the components in the cabinet are damaged and whether the accessories are consistent with the packing list.

◇ check whether the attached documents are safe.

a. Product operation instructions and instructions for components in the cabinet;

b. Delivery test report;

c. Product certificate; d. Packing list; e. Secondary wiring diagram. Installation and commissioning

◆ during installation, first place the ring main unit on the installation foundation, arrange it neatly, debug it, and then fasten it with fasteners.

◆ when installing the main bus, open the bus room for installation, and the contact surface connecting the bus shall be flat and free of dirt.

◆ the ring main cabinet shall be reliably grounded, and the circuit inspection shall be conducted for the grounding.

During commissioning, the commissioning shall be carried out according to the operation manual of ring main cabinet and the instructions of various components in the cabinet.

◆ after installation and commissioning, each switching element and anti misoperation mechanism shall be operated for 5 times. If no abnormality is found, it is considered that the mechanical operation of the switch is normal.

Use and troubleshooting

◆ check before power transmission

Before power transmission, the ring main cabinet shall comprehensively check the electrical performance, insulation level and wiring correctness of components in the cabinet

Check - the switch can be put into operation only after it is normal.

◆ normal operation

During normal operation, no matter the incoming cabinet or outgoing cabinet, the load switch shall be in the closing position, the grounding knife shall be in the opening position, and the cabinet body shall be closed and locked.

◆ troubleshooting

◇ when troubleshooting the incoming cabinet, first cut off the incoming power supply, open the load switch, check the live display on the cabinet, close the grounding knife and open the door for maintenance after confirmation.

◇ when troubleshooting the outgoing cabinet, first disconnect the load switch in the cabinet, close the grounding knife, and open the front door for maintenance. At this time, the main bus is live. maintenance and overhaul

◆ the ring main unit needs to be maintained and overhauled under the following conditions;

a. Check the insulation level of the product after 5 years of operation;

b. After the load switch is disconnected for 100 times, the main circuit resistance, power of the load switch, static contact and auxiliary contact shall be checked.

◆ generally, the ring main unit shall be maintained and overhauled after power failure.

联系方式

No. 607, wanweng Road, Weng Long Street Industrial Zone

期待你的来电

搜了网提醒您:
1、本信息由搜了网用户发布,搜了网不介入任何交易过程,请自行甄别其真实性及合法性;
2、跟进信息之前,请仔细核验对方资质,所有预付定金或付款至个人账户的行为,均存在诈骗风险,请提高警惕!

相关资讯

在线给我留言
免费开通商铺
扫码关注电气网
服务热线
4008-635-735